Technological News Portal
Browsing Tag

Technology

Watch How An Entire Bridge Was Moved In Portland

The 1971 feet (601 m) long and 75 feet (23 m) wide Sellwood Bridge in Portland, Oregon, was built in 1925. Due to cracks on the bridge and public safety issue, engineers decided to repair the 1,100-foot, 3,400-ton truss of that bridge. To do so, they had to move that portion. Recently, engineers have moved the entire bridge without cracking it.
Read More...

Digital Tattoos And Mind-reading Headphones May Come In Near Future

Science and technology are deeply inter-related with each other. Although prediction is more of an art than a science, based on science and technology scientists and researchers have been predicting new devices or new technology. In the current world as both the technology and science have advanced tremendously and these two will be advancing…
Read More...
Why Not Join 250,000+ Readers, Like You!
AND GET OUR LATEST CONTENT IN YOUR INBOX

SUBSCRIBE 
Your information will never be shared
close-link