What are you thinking?

View Results

Loading ... Loading ...
1 Star2 Stars3 Stars4 Stars5 Stars (Rate This)
Loading...Loading...

Yosemite National Park has rolled out a new solar power system that is placed on existing structures to minimize the impact to the views and environment in the park and the solar array cost the park $5.8 million to install and is the largest solar installation to ever be added to a national park. Yosemite National Park has installed over 2,800 solar panels in the El Portal maintenance complex, neatly hidden from the all seeing eyes of the public and the plenitude of photovoltaic plates will produce about 800,000 kWh per year, saving the park $50,000 annually on its power bill and scoring it $700,000 in rebates from PG&E over the next 5 years………………

 

Yosemite National Park Superintendent Don Neubacher led a ribbon cutting ceremony today, July 27, to dedicate the El Portal Photovoltaic Project. Neubacher was joined by representatives from the offices of Senator Dianne Feinstein (D-CA), Congressman Jeff Denham (R-19th), Mariposa County Supervisor Lee Stetson, contractors, and National Park Service staff. The event dedicated the largest grid-connected photovoltaic system within the National Park Service (NPS). The photovoltaic system at the El Portal complex is the largest NPS-managed photovoltaic project with the Pacific West Region and the largest grid-connected photovoltaic system owned and operated by the NPS. The 672 kilowatt (KW) system consists of 2,800 solar panels and produces approximately 800,000 kilowatt hours (KWh) per year. The park estimates saving approximately $50,000 per year on electricity purchased off the grid and is expecting to receive a $700,000 energy rebate from Pacific Gas & Electric Co. (PG&E) over the next five years. This represents an approximate 12 percent reduction in electricity purchased off the grid. “The collaborative effort to design and build this system has come to fruition and we are extremely proud of the results,” Stated Neubacher. “We are committed to being a leader in renewable energy and this project exemplifies our efforts.” The project was funded through the American Recovery and Reinvestment act and cost $5.8 million. Construction of the system was completed in February 2011 and the interconnection agreement with PG&E was signed in late June 2011. The El Portal Maintenance and Administrative Complex is located at the western edge of Yosemite National Park adjacent to Highway 140. The facility includes park offices, vehicle maintenance facility, the park warehouse, and other park operations. The location was chosen for the photovoltaic project due to the high amount of direct sunlight the site receives.

 

 


Vibrating Glove Prototype To Improve The Wearer’s Sense Of Touch

Download Mac OS 10.7.2 Seed Along With iCloud Beta 6
You can also press the left/right arrow key on your keyboard to go to previous/next post
  On August 7, 2011(3 years, 4 months ago.)

Recent Products

Buy Now | Compare  
Buy Now | Compare  
Buy Now | Compare  
Buy Now | Compare  
Compare  

What Do You Think?

Loading Disqus Comments ...
Loading Facebook Comments ...

Recent Search

Recent Tutorials

Many users are already complaining and searching for the tips of how to capture the screenshot on LG G3. The tutorial will help to do that.
The tutorial will help how you can minimize the mobile data on your android device (Here we used LG G3 S for the tutorial)
The tutorial will help you to turn on battery Saver for LG G3 or G3 S both manually and automatically.
This tutorial is about how you can set up various auto reply messages on LG G3 S tp know the caller why you could not answer the call.
This tutorial is about disabling automatic shortcut creation of new installed app on android devices.
This tutorial is about showing you how to turn off location in Facebook of your Android devices.
My tutorial is for those who wants to delete those history partially or fully or to disable those if they want.
This tutorial will show you how to stop those videos in your Android mobile not to play automatically.
This tutorial will help you to Disable Auto-Update Of Android Apps in your Android Device. The steps are quite easy to execute.
This tutorial will help you to clear search history from your Google Play Store in your Android Device. The steps are quite easy to execute.
Close You Have To Login
User:
Pass:
Login With »Login With TwitterLogin With Facebook